Attendees at our February meeting were treated to an excellent presentation on the National Park Service (NPS) projects underway along our beloved canal. Joe Reed, Professional Engineer and Certified Floodplain Manager, used a presentation (https://cabinjohn.org/wp-content/uploads/2024) to provide this detailed update to our community. Here are the highlights:

– The Log Wall – This has been a frequent topic for our community as there is much interest, particularly as it impacts the water level in the canal. The dry-laid stone wall was originally built in 1828 and suffered a flood in 1889, was disrupted in the 1960s with the construction of the Potomac Interceptor, and suffered sinkholes formation in the past decade.

The NPS has an active project to remediate these issues and prevent the failure of the 1,015 foot long wall, maintain the continuity of the 184.5 mile towpath, restore hydraulic connectivity (“fill it up with water”) and stabilize the nearby tributaries.

Completion of the project is expected this summer if the weather cooperates.

– Georgetown Locks and Walls – A large-scale construction project to rehabilitate multiple historic structures including Locks 1, 2, and 5; Inlet Lock 1; Guard Lock 1; Level 4 North and South Walls upstream of Wisconsin Avenue; and Level 4 Wall at 34th Street.

All of these sites are located along the lower five miles of the Chesapeake & Ohio Canal National Historical Park. The project will begin in early Spring 2024 and construction will last approximately two years, weather dependent.

– Fletchers Cove Access Road – This is to repair damage caused by a flash flood on July 8, 2019. During the high-intensity rainfall event, the existing stormwater drainage system was overcome, causing damage to NPS infrastructure.

This project will repair stormwater drainage features (swales, pipes, drainage channels, and underdrain systems), stabilize bridges and roadways supporting traffic along the access road to the lower Fletchers Cove Parking Lot, and repave damaged road surfaces.

– Rehabilitation of Levels 20, 21, and 22 – There are plans to rehabilitate portions of the canal in a 7.8-mile section of the Chesapeake & Ohio Canal. The project is located between Milepost 14.3 (Lock 20) and Milepost 22.1 (Lock 23 and Inlet Lock 2).

This reach is the most upstream portion of the watered section of the canal near Great Falls and is a very popular recreation area with over one million visitors per year. The primary objective of the sediment and debris removal is to improve the hydraulic connectivity of the canal along this reach, referred to as Levels 20, 21, and 22.

Over time, sediment and debris have accumulated within the project area to the point where it has disrupted canal water flow and impacted many of the park’s critical mission components.

Due to funding constraints, it’s anticipated that not all accumulated sediment within this reach of the canal will be addressed. Currently, only sediment removal from the canal prism extending from Lock 20 and moving upstream to just past the Great Falls Tavern Parking Area are included in the awarded construction project.

A big thank you to Joe Reed and the National Park Service!

See all meeting minutes

Search Cabin John

Search stories, pages and the text inside full newsletter PDFs. Use arrow keys to browse and Escape to close.

Search the website and newsletter PDFs

    Try a name, place or story topic.

    ↑↓ to browse Enter to openEsc to closeTap a result to open the document